[edit] Introduction
On a building construction project, the ‘project information’ is all the information, in whatever format, that is used to create, communicate and realise the project from its inception.
Given the potentially large number of people that may be involved in such projects, including clients, consultants, contractors, subcontractors, and other stakeholders, the amount of information created can be enormous and may include letters, sketches, drawings, schedules, bills of quantities, specifications, contracts, models and so on. This includes information that, whilst it may have been superseded, nevertheless contributed to the overall realisation of the project and so is typically retained for record purposes.
The RIBA Plan of Work 2013 defines project information as; 'Information, including models, documents, specifications, schedules and spreadsheets, issued between parties during each stage and in formal Information Exchanges at the end of each stage.'
[edit] Types of information
The types of information that may be generated on a building project can include:
- Feasibility studies, options appraisals, sketches, design drawings (plans sections, elevations), working drawings, schedules (e.g doors, windows, ironmongery etc), models, specifications, instructions, request for information, letters, etc.
- Reports, calculations, drawings, junction details, site surveys, test results etc
- Bills of quantities and schedules.
- Contracts, invoices, purchase orders, certificates, notices.
- Applications and permissions.
[edit] Information formats
The advent of the digital age and increasingly of proprietary software has meant that a wide range of formats are available for information. In addition to the traditional formats of hard-copy print (namely paper), information may also be created as digital files, such as CAD (e.g AutoCAD and Revit), data that may be kept as a part of a building information model (BIM) and so on.
This can cause interoperability problems, and file exchange formats have had to be developed that can allow the transfer of information between different types of proprietary software (with varying success).
[edit] Storage
For storing information there are various options:
- Traditional filing cabinets and drawing chests (for paper-based information);
- Local computer hard drives;
- Cloud-based services;
- Common data environments.
[edit] The advent of digital
The digital revolution that has occurred in the past two decades has, in some respects, served to generally reduce the amount of paper that is produced in a building project. The old practice of issuing drawings to the client and other consultants, then reissuing them with amendments, repeating the process whenever new amendments were needed so that each person amassed a wodge of drawings, may no longer be necessary.
In place of paper-based information, an electronic file may simply be emailed to the relevant parties or, if BIM is being used, the model can be updated once in real time: the updated information is available instantly and accessed whenever any of the parties choses to see the model. This means far less paper is generated (therefore better for the environment) and everybody sees the latest version of the information. Even email has reduced the amount of paper being used: fewer letters in the post, fewer faxes being sent and cheaper than sending mail in the post.
[edit] Change control
At certain stages in the design process, a complete package of information will be provided for the client to approve. Once this approval has been given, a change control procedure may be introduced to ensure that the approved information is not changed without the express permission of the client.
For more information see: Change control.
[edit] Document control
An understanding of where information is, who created it, what it is for and how to retrieve it is extremely important in order to avoid confusion and mistakes.
Organisations may have their own internal quality management system or ISO 9001 certification that sets out their document control procedures, but on a building design project, the consultant team members and the client may wish to agree a common system of document control.
For more information see: Document control.
[edit] Related articles
Featured articles and news
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.
A new government plan for housing and nature recovery
Exploring a new housing and infrastructure nature recovery framework.
Leveraging technology to enhance prospects for students
A case study on the significance of the Autodesk Revit certification.
Fundamental Review of Building Regulations Guidance
Announced during commons debate on the Grenfell Inquiry Phase 2 report.
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.